June Update

June 16th, 2015|

The Design Team and its contractors remain engaged in several activities on the canal as the warm summer weather continues.

Drilling for Bulkhead Study: As part of our continuing study of bulkheads in the canal, we will strategically begin drilling borings near and along existing […]