July Update

July 28th, 2015|

The Design Team and its contractors continue working on several projects on the canal.

Drilling for Bulkhead Study: As part of EPA’s remedy, dredging will be required along existing bulkheads. Through the bulkhead study, we are learning about the structure of the existing bulkheads and assessing […]