The design team is preparing for a debris removal pilot study, scheduled to begin in the summer of 2016. The pilot study will take place in the 4th Street Turning Basin of the Gowanus Canal. The purpose of the study is to:

  • Clear obstructions preventing navigational […]

August 2015

August Update

August 31st, 2015|

The Design Team and its contractors remain engaged in several activities on or near the canal.

Drilling for Bulkhead Study

In August, the field team will conclude the first phase of canal bulkhead assessments. This work included soil sample collection, geophysical tests and boring […]