June 11, 2020

The Pilot Study performed in the Turning Basin 4 of the Gowanus Canal was successfully completed December 2018.  Since then, the (the Team) has incorporated the results and lessons learned from this Pilot Study into the design documents for the remediation of the Remedial Treatment Area 1 (RTA-1) (see map).