During the week of December 27, the Gowanus Remediation Team continued In-Situ Stabilization (ISS) along the Bond Street Promenade.
Work continued on the sheet pile bulkhead installation at the head of the canal. Recently installed sheet piles were cut to an appropriate height and sealed.
Next week, site clearing will begin at the former Turning Basin 1 (TB1). The filled-in turning basin will be excavated as a part of the cleanup.
Photos of construction activities are provided below.