During the week of May 16 the Gowanus Remediation Team (GRT) resumed In Situ Stabilization (ISS) north of Union Street.
Additional equipment and materials were mobilized in preparation for upcoming monopile installation at the Union Street Bridge.
The existing timber pilings (dolphins) at the Third Street Bridge were prepared for replacement with monopiles. Bolts and cable wrap were removed.
Work on the drainage and filtration systems at the Degraw Street bulkhead continued.
Photos of construction activities are provided below.