Progress Update, Week of September 2nd, 2024

During the week of September 2, the Gowanus Remediation Team (GRT) continued the RTA 2 Access Dredging Operation to prepare locations of work for Bulkhead Installation.

Bulkhead installation began near 6th Street. Equipment and materials were mobilized to the location. Sheet pile installation began.

Access dredging was performed near 12th Street and near Hamilton Avenue. Additional bulkhead monitoring equipment installation continued.

Photos of construction activities are provided below.

Crane barge mobilization underway at the Staging Area.
Sheet pile installation in progress near 6th Street.