During the week of February 16, the Gowanus Remediation Team (GRT) continued RTA 2 Bulkhead Support System installation operations.
Bulkhead installation continued at the 6th Street Turning Basin. Tiebacks were installed. Grout was placed.
Bulkhead installation continued at the 7th Street Turning Basin. Underpinning of upland structures continued. Sheet piles were installed.
Bulkhead installation continued near 9th Street. Controlled low-strength material (CLSM) was placed.