During the week of July 15, the Gowanus Remediation Team (GRT) continued the RTA 1 Capping Operation.
Supplemental dredging near Douglass Street continued. Divers removed material from the Flushing Tunnel.
Access dredging was conducted within the 7th Street Turning Basin (TB7).
Probing activities were conducted near 5th Street.
Photos of construction activities are provided below.