During the week of July 29, the Gowanus Remediation Team (GRT) continued the RTA 1 Capping Operation. Gravel placement near Douglass Street continued.
The RTA 2 Bulkhead Installation Operation continued. Bulkhead/Structure Monitoring Equipment was installed. Access dredging was conducted near 3rd Street.
Divers were utilized to locate submarine cables at the Third street and Hamilton Ave bridges.