During the week of July 7, the Gowanus Remediation Team (GRT) continued RTA 2 Bulkhead Support System installation operations.
Bulkhead installation continued near 9th Street. Grout was placed. Site restoration was performed at completed sections.
Bulkhead installation continued at the 7th Street Turning Basin. Tiebacks were installed. Grout was placed.
Bulkhead installation continued near 3rd Street. Preparations were made for upcoming tieback installation.
Bulkhead installation continued at the 6th Street Turning Basin. Sheet piles were installed. Sealant was placed. Installed sheets were backfilled with gravel.