During the week of July 8, the Gowanus Remediation Team (GRT) continued the RTA 1 Capping Operation.
Supplemental dredging near Douglass Street continued. Sediment was removed. Controlled low strength material (CLSM) and structural concrete were placed.
Access dredging was conducted within the 6th Street Turning Basin (TB6) and near 4th Street.
Probing activities were conducted near 6th Street.
Photos of construction activities are provided below.