During the week of March 30, the Gowanus Remediation Team (GRT) continued RTA 2 Bulkhead Support System installation operations.
Bulkhead installation continued near Bush Street. Tiebacks were installed.
Bulkhead installation continued at the 6th Street Turning Basin. Existing drainage outlets were joined with new bulkheads.
Bulkhead installation continued near Bond Street. Sheet piles were installed.
Bulkhead installation continued near 9th Street. Concrete was placed.
Bulkhead installation continued at the 7th Street Turning Basin. Tiebacks were installed.