During the week of May 4, the Gowanus Remediation Team (GRT) continued RTA 2 Bulkhead Support System installation operations.
Bulkhead installation continued near Bond Street. Tiebacks were installed.
Bulkhead installation continued near 9th Street. Site restoration was performed.
The turbidity curtain was removed at the 4th Street Turning Basin.