During the week of September 21, the Gowanus Remediation Team (GRT) continued RTA 2 Bulkhead Support System installation operations.
Aquatic sampling was conducted.
Drain outlets were sealed near 3rd Street.
General site restoration, inspection, and final as-built surveying, was conducted at all properties where the GRT has been active in RTA 2.