Cultural Resources Review Results #4, January 8, 2021
INTRODUCTION Dredged material is processed according to the Level 1 Archaeological Monitoring protocol outlined in the draft Cultural Resource Monitoring Plan (revised September 2020). This
Please be advised that Phase 1 of dredging in RTA 1 is complete. The next phase of dredging is scheduled for 2022. No further Cultural Resources Review Results are expected to be published until dredging resumes in 2022.
INTRODUCTION Dredged material is processed according to the Level 1 Archaeological Monitoring protocol outlined in the draft Cultural Resource Monitoring Plan (revised September 2020). This
Dredged material is processed according to the Level 1 Archaeological Monitoring protocol outlined in the draft Cultural Resource Monitoring Plan (revised September 2020).
Dredged material is processed according to the Level 1 Archaeological Monitoring protocol outlined in the draft Cultural Resource Monitoring Plan (revised September 2020).
Dredged material is processed according to the Level 1 Archaeological Monitoring protocol outlined in the draft Cultural Resource Monitoring Plan (revised September 2020).
Our phone number has changed! To contact the Gowanus Remediation Team please email info@gowanussuperfund.com or call the new hotline at (718) 569-5762.