Please be advised that Phase 1 of dredging in RTA 1 is complete. The next phase of dredging is scheduled for 2022. No further Cultural Resources Review Results are expected to be published until dredging resumes in 2022.

Cultural Resources Review Results #10, March 19, 2021

INTRODUCTION Dredged material is processed according to the Level 1 Archaeological Monitoring protocol outlined in the draft Cultural Resource Monitoring Plan (revised September 2020). This protocol calls for dredged soft sediments to be placed directly into barges, floated to the processing facility, and screened over [...]

Cultural Resources Review Results #9, March 4, 2021

INTRODUCTION Dredged material is processed according to the Level 1 Archaeological Monitoring protocol outlined in the draft Cultural Resource Monitoring Plan (revised September 2020). This protocol calls for dredged soft sediments to be placed directly into barges, floated to the processing facility, and screened over [...]

Cultural Resources Review Results #8, February 26, 2021

INTRODUCTION Dredged material is processed according to the Level 1 Archaeological Monitoring protocol outlined in the draft Cultural Resource Monitoring Plan (revised September 2020). This protocol calls for dredged soft sediments to be placed directly into barges, floated to the processing facility, and screened over [...]

Cultural Resources Review Results #7, February 12, 2021

INTRODUCTION Dredged material is processed according to the Level 1 Archaeological Monitoring protocol outlined in the draft Cultural Resource Monitoring Plan (revised September 2020). This protocol calls for dredged soft sediments to be placed directly into barges, floated to the processing facility, and screened over [...]